welcome to the concrete solution to plastic waste
Concrete kerbs, channels and edgings with RESIN8™ were selected on the Phase 2A IRT Infrastructure Project to illustrate the massive contribution that local Government infrastructure projects can make towards diverting plastic waste from landfill, by completion this will amount to over 37 tons of mixed plastic waste diverted & over 283 tons of mined aggregate saved.
Concrete kerbs, channels and edgings with RESIN8™ were selected on the Phase 2A IRT Infrastructure Project to illustrate the massive contribution that local Government infrastructure projects can make towards diverting plastic waste from landfill, by completion this will amount to over 37 tons of mixed plastic waste diverted & over 283 tons of mined aggregate saved.
PROJECT STUDY - AZ BERMAN DRIVE
PROJECT INFORMATION
Developer
CITY OF CAPE TOWN
Manufacturer
I & S CONCRETE / BLUBLOK
Eco - Aggregate
RESIN8™ / 6mm
Products
KERBS, EDGINGS & CHANNELS
Location
AZ BERMAN DRIVE / MITCHELLS PLAIN
CONSTRUCTION COMPANY
CONSULT ENGINEERS
MARTIN & EAST
GIBB
Concrete products made with a percentage of RESIN8TM Eco Aggregate test within the required SANS specifications.


RESIN8™ ECO-AGGREGATE
10%
RESIN8™ PER KERB
1 816 Grams
RESIN8™ TOTAL
44.1 Tons
DISTANCE COVERED BY KERBS
26.3 Km
TOTAL MIXED PLASTIC WASTE SEQUESTERED
37.07 Tons
RESIN8™ ECO-AGGREGATE
10%
RESIN8™ PER CHANNEL
1 816 Grams
RESIN8™ TOTAL
28.3 Tons
DISTANCE COVERED BY CHANNELS
15.6 Km
TOTAL MIXED PLASTIC WASTE SEQUESTERED
23.09 Tons
RESIN8™ ECO-AGGREGATE
10%
RESIN8™ PER E3 EDGING
1 816 Grams
RESIN8™ PER E1 EDGING
908 Grams
RESIN8™ TOTAL
12.7 Tons
DISTANCE COVERED BY EDGINGS
12.1 Km
TOTAL MIXED PLASTIC WASTE SEQUESTERED
10.35 Tons
PROJECT PLASTIC SUMMARY
mixed plastic
waste sequestered
Total
70.6 Tons

mixed plastic
waste sequestered
EQUAL TO
37 323 924
Chip packets
*calCulated @ 2g per empty packet. 2000 chip packets per m2 of paving
MINED AGGREGATE SAVED
weight of natural mined aggregate saved
Total
283.6 Tons